blasting iron ore boulders

blasting iron ore boulders

  • Numerical simulations of lowering boulder yield based on delay

    2021年4月2日  Abstract. Boulders, a common problem in sublevel caving mining, usually result in a low ore production efficiency and high production cost. To achieve safety and efficient production, LS-DYNA was used to study the delayed and double-primer 2009年9月1日  Oversize fragments, or boulders, are the most undesired rock fragmentation in the mining industry. An oversize rock fragment Causes, implications and control of oversize during Therefore, a new blasting scheme with combined blastholes with different diameters is proposed to solve the problems of oversize boulders and toes under the condition of large-diameter...Approaches to reducing the oversize boulders and toes.

  • (PDF) Prediction of blast boulders in open pit mines via

    Prediction of produced boulders (oversized crushed rocks) is a key parameter in designing blast patterns. In this study, the amount of boulder produced in blasting operations of Golegohar iron ore open pit mine, Iran 2023年5月27日  Oversize fragments, or boulders, are the most undesired rock fragmentation in the mining industry. An oversize rock fragment can be defined as ‘any Dumping oversize rock fragments in orepasses: the impact on the ...The blast design based on geophysical/geological models resulted in significant improvement in the fragmentation of the iron ore. This was achieved by the adoption of Geophysical Techniques Applied to Blasting Design

  • OneMine Geophysical Techniques Applied to Blasting Design

    2015年8月24日  The blast design based on geophysical/geological models resulted in significant improvement in the fragmentation of the iron ore. This was achieved by the A Sim-baH1354 hydraulic drill is used for drilling vertical fan-shaped blastholes with a diameter of 80 mm; an elec-tronic scraper with a capacity of 4.0 m3 is used for carrying Optimization and application of blasting parameters based on the ...2007年5月31日  This paper presents an approach to improve overall blasting efficiency in an iron ore mine. The problems existing in the mines were oversize fragmentation, An approach to improve blasting efficiency in an iron ore mine

  • Prediction of blast boulders in open pit mines via multiple

    2016年3月1日  Prediction of produced boulders (oversized crushed rocks) is a key parameter in designing blast patterns. In this study, the amount of boulder produced in